DIE BESTEN SIDE OF DINNER

Die besten Side of dinner

In 1993 the power grid connections hinein the Berlin-Brandenburg capital region were renewed. In most of the inner districts of Berlin power lines are underground cables; only a 380 kV and a 110 kV line, which run from Reuter substation to the urban Autobahn, use overhead lines. The Berlin 380-kV electric line is the backbone of the city's energy

read more